I use galvanized deck nails (with the ridges)....4X6 treated posts and 2X8s for the girts and yes, I've built trusses. They are a pain to put up unless you have a post-top winch or a crane. Be sure...
Type: Posts; User: mike120
I use galvanized deck nails (with the ridges)....4X6 treated posts and 2X8s for the girts and yes, I've built trusses. They are a pain to put up unless you have a post-top winch or a crane. Be sure...
I'm just a bit north of you and I usually wait until mid to late November. I get my seed at the local feed store and usually put it down at around 50# per acre.
The Befco pulverizer would probably work but unless you find a used one it's a bit pricy.
I use two main implements for my arenas...I use a tiller most of all. I can adjust the depth and go...
I'm assuming that that you are talking about crushed limestone. If it's small enough to be compacted well and leveled it will make a good stall floor. However, you will need to put stall mats on top...