    The house slab in the basement finally got poured this week. The foundation walls were poured in late June so there have been several delays with the contrator (due to another job). Hopefully the first floor trusses will arrive the week after next so they can be installed by the framing crew. Then the house should really take off. Here's a photo the slab being poured.

  2. #2
    Member
    Join Date
    Sep 2002
    Location
    SC, Aiken
    Posts
    95

    Re: House construction continues

    Another photo of the trucks. They were getting stuck so I got tractor time keeping the entry smoothed with my loader bucket. [img]/forums/images/icons/smile.gif[/img]