Shows basement excavation looking south. Curved line of back fill receding toward south shows intercepting trenchline where it hooks to right and joins the trench to the pond used by drain lines for foundaton drains. They join well downslope of basement so no water diversion compromise was made. Center forefround is the center of the "L" shaped inteercepting trench.