I just purchased a new place with about a 600ft driveway. The home is new and the driveway looks to have been neglected in favor of expenditures on the house. It currently has more mud than gravel. I need to get something done ASAP. My initial thought is to get a load or two of gravel dumped on it, with the idea that in the next year of so I will have it paved with asphalt or concrete. Assuming the funds were available, would it be better to go ahead with the paving project now? I assume I can just use the gravel as a base for the paving whenever it takes place. True?
Anyone have any idea how many loads I'd need to adequately cover my footage and how much a load might cost in North Texas (DFW Metroplex)? Any ideas on how much it would cost to concrete or asphalt this amount of footage? Any help appreciated.