I am doing the research for having my first pole barn built. In doing the research I noticed that in most cases the building is built and after it is finished the concrete floor is installed. I would think it would be easier for the cement contractor if the floor was done first. Why is this not done? [img]/forums/images/icons/confused.gif[/img]