Larry, I'm sorry, but I don't know- the fabric roll was given to me by a buddy in the construction business - he had 2 rolls left from a paving job. He used one and I got the other in exchange for some design work I did for him. Barter system at work!
I'm sure someone here will know.
how many tons of base did u use? i was thinking of doing the same thing at my place, but the drive is only about 250' long...and any idea what the road fabric costs if we have to purchase it outright?
What you see in the picture took 153 cubic yards of base. I also had an additional truckload of 14 yds. dumped in a pile to use for repair and additional fill where needed.