Originally Posted by
BobL
I am interested in your idea. I am going to build a building on my sloped lot the road to the property borders the properety at the top of a hill wich is my lot. I want to build a 30 X 50 or bigger building, and was considering just digging out and making a basement on the end opsite the road, this would allow me to drive into the building from the road and have a second level below for storage. I was only thinking of digging out half of the building length so for example the building below would be 25 X 30. My concern was how to finish the floor of the top floor. Part will lay on th the earth but part will be over open space, how is that best handled.??
Bob